Sunday, October 28, 2018

New Build Home Timeline Part 2

stumped building lot

Here's a small panorama shot of the cleared and stumped lot. Copyright 2018 Tim Carter

New Build Home Timeline Series - Part 2

This is part two of a new build home timeline series following my own daughter and son-in-law. They are building a new home on Mt. Desert Island in Downeast Maine.

At the bottom of the page, you'll discover a link to the next part of the series.

Related Links

Lot Clearing Tips - FREE ADVICE

Land Clearing Challenges - PLEASE SHARE to friends to save $$$$

New Build Home Timeline Part Two - Lot Clearing Continued

Week Two - October 21, 2018

Week two of the project saw further progress on the lot clearing. It's important to realize the lot and the septic tank leach field had to be cleared and all stumps removed.

cut logs excavator

The giant orange excavator is here to claw the stumps out of the ground. It's parked just about where the driveway will connect to the road. Copyright 2108 Tim Carter

cleared building lot

The stumps have been dug out. The small bulldozer is there to do a fast rough grade so the house can be staked out. Copyright 2018 Tim Carter

stumps removed and slash

This is the view looking from the road across the rough driveway cut. On the right side of the photo in the shade is a giant pile of slash - tree branches - that will be removed next week. Copyright 2018 Tim Carter

Link to Week Three - October 28, 2018 - will be active on November 3, 2018.

The post New Build Home Timeline Part 2 appeared first on Ask the Builder.

Via Home http://www.rssmix.com/

No comments:

Post a Comment